We hand over a result, not a delivery note
Grout take tells you what went into the ground. It does not tell you what was achieved. So every job we take on is closed against an acceptance value agreed with you before work starts: a target Lugeon or permeability, a measured reduction in inflow, levels held under traffic, or a classified seepage survey.
Result Grouting
Five stages, all done by our own people
The framework developed by our managing director for grouting that has to work the first time it is tried.
Investigate
Strata, water, water pressure and inflow assessed, with ERT, GPR or MASW where the cause is hidden.
Design
Hole pattern, sequence, pressure and volume set in house, and written into a method statement.
Formulate
The grout or resin made for this ground and this temperature; reaction time and viscosity adjusted at site.
Inject
Our pumps, our packers and our supervised crews, working to the design, shift after shift.
Verify
Check holes, inflow measurement and a second survey, then handover of the result achieved.
Field quality control
Six checks on every injection campaign
Batch
Batch check on delivery: lot number, date of manufacture, expiry, and the A and B components matched.
Ratio
Mixing ratio verified by mass on the first batch of each working day.
Cup test
A cup test at the start of each shift, to confirm the gel time under that day’s conditions.
Retained sample
A retained sample from each pour, time-stamped and kept for 28 days.
Hole log
Pressure and volume logged for each hole, with take limits and stage refusal criteria set in advance.
Verification
Independent verification of the outcome: MASW before and after, or a measured reduction in inflow.

On a running line, the repair has to fit inside the block, and the track has to be ready before the first train.
Working on live infrastructure
The structure stays in use while we work
Traffic blocks
Every task sized to the night block or the gap between trains, and the line handed back on time.
Overhead equipment
Drilling beside 25 kV equipment only under power blocks.
Monitoring while injecting
Levels, optical targets or other instruments set the pressure that is safe to use.
Safety
Work under our ISO 45001 system, with a safety steward in every crew.
Documents on request
Ask for the paper behind any claim on this site
- Certificate of incorporation, GST, MSME and EPF registrations, and the pollution control consent for the plant.
- ISO 9001, 14001 and 45001 certificates.
- Client certificates and letters for the projects on this site.
- Technical data sheets for the products proposed, and safety data sheets where issued.
- Method statements, sample grouting records and QA logs.
- CVs of the proposed site team.
Bring us in before the ground surprises you
We will visit the site, review the ground data and return a grout design and method statement before any commercial discussion.